BANDIRMA COMBINED CYCLE POWER PLANT

OZG has realized the installation of 2 heat recovery steam generators for Bandırma 920 MW Combined Cycle Plant which were manufactured by Nooter-Eriksen within the contract undersigned with AE&E/Austria in addition to completing the installation of blow-down, by-pass, gland-steam, condensate and coolant systems for the second phase of pipe installation within the scope of BOP (Balance of Plant) together with the installation of feed water pumps, manufacturing and installation of steel structures, power supply for the construction site, installation of emergency diesel unit and feeder system, power distribution system for complete site and lightning system as well as the installation of an auxiliary boiler unit within the contract undersigned with CLAYTON/Belgium which was submitted with an acceptance protocol in 2011.