TUFANBEYLİ THERMAL POWER PLANT

Mechanical installation works of the Tufanbeyli Fluidized-Bed Thermal Power Plant of 3x150 MW, undertaken by ENERJİSA Energy Generation Inc. pursuant to the contract signed with SK E&C / South Korean firm on May 2012 shall be executed by OZG. The contracting work consists of the general installation works of 2 complete steam boilers with circulated fluidized-bed technology and related equipment, flue gas desulphurization plant, electro-filters, cooling system and underground cooling water lines. The assembly of over 42.000-ton steel and equipment and approximately 120.000 weld dia-inch pipeline will be realized within the scope of the project which is planned to be completed as of 2015.